Some significant dates:
1924 Design work begins
July 1928 Cylinders ordered
Feb 1929 Boiler construction completed
Oct 1929 Boiler testing completed
Nov 1929 Locomotive completed
Dec 1929 First trial run
April 1930 Superheater area reduced
Oct 1936 Last journey to Doncaster for rebuild |
| Left: The 4-6-4 10000
|
On its first run in January 1930 steaming was wholly unsatisfactory, the highest steam pressure recorded in the HP steam chest being 305 psi. An intermediate superheater (surely really a reheater) was added to raise the LP steam temperature by 100 degF. Other modifications such as a double blastpipe were tried, but boiler performance was apparently always poor, probably below 50%.
In October 1936 the 10000 was rebuilt with a standard A4 Pacific boiler.
Photograph probably taken in 1932. The 10000 was presumably arriving for the exhibition advertised above.
Above: A contemporary drawing of the 10000, with naming of parts.

Left: The 10000 with attendants

Left: The 10000 spent quite a lot of its time at exhibitions to drum up publicity.

Left: The 10000 emerging from Stoke tunnel and entering Ipswich station.